ECOJOHN Logo
1-866-ECOJOHN

 


 

The installation of Basic is a very easy process. The toilet comes equipped with a standard 8 ft vent system, which includes pipes, flashing with storm collar, and a chimney cap. The 2.5’’ PVC pipe can be installed vertically or horizontally.

EQUIPMENT & MATERIALS
            Hammer                                                            Drill
            Caulking Gun                                                     Plumb Bob
            Screwdriver (Phillips and Standard)                      Tin Snips
            Saber or Keyhole Saw                                        Level
            Dependable Latter                                              Tape Measure
            Proper Gloves and Shoes                                   Eye Protection

            Materials You May Need:
            Silicone Sealant                                                 8 Penny Nails
            #8, 2-1/2” & 1-1/2” Wood Screws             Roofing Nails

STEP-BY-STEP INSTALLATION INSTRUCTIONS

basic installation

  1. Place Appliance: Place ECOJOHN™ Basic in its proper location, it does not have to be mounted in the ground.

basic installation

  1. Cut Openings: Cut the ceiling and roof openings in your desired locations.

basic installation

  1. Attach Roof Flashing: Assemble the chimney sections to a point above the roof, then slip the flashing over the chimney. On an existing roof, center and install the flashing before extending the chimney section up through the flashing. Always insure the chimney remains vertical (use level). Seal the joint between flashing and other surfaces with silicone caulk.

basic installation

  1. Assemble Chimney Sections: Assemble the chimney sections and connect it with the connector pipe coming up from the toilet.

basic installation

  1. Fasten Rain Cap: Lastly add the rain cap onto the chimney pipe, now chimney installation is complete.

basic installation

  1. Install 90° Elbow: It is also possible to install the chimney out through a side with a 90° elbow.
Figure 1

 

Building a Drain Pit

 
                                                                                  Figure 2

Dig a drain pit approximately 12" to 24" deep and 12" to 24" wide.
Add about 24" or more of loose fill such as sand or crushed rocks below the drain pit.
Add lime stone gravel inside the drain pit.
Guide the waste hose that comes with the toilet towards the drain pit.
Connect the hose to a PVC pipe and guide it into the center of the drain pit, ensure that the pipe will gravity feed the liquid waste into the drain pit.
Next you will need to cover the top of the lime stone gravel with a plastic cover.
On top of the plastic cover add another 2" of earth; then add another 6" to 10" of sand, soil, and grass, which will protect the drain pit from rain. It is important that the drain pit get installed about 50 ft. or more away from any water source, 60 ft. or more from any well and away from any high water table.
Be sure to check local authorities for any restrictions regarding drain pits.

 

  View
Manuals
   Installation     Maintenance   Troubleshooting   Specification 

ECOJOHN™ Basic
A Waterless Separating Composting Toilet
 
 
 
 
 
 
 
 
 

ECOJOHN™ Sr

A Waterless Incinerating Toilet (Propane)
 
 
 
 
 
 
 
 
 

ECOJOHN™ WC5

A Controlled Waste Incinerator (Propane)
 
 
 
 
 
 
 
 
 

ECOJOHN™ WC16

A Controlled Waste Incinerator (Diesel Fuel)
 
 
 
 
 
 
 
 
 

Company  l  Sitemap  l  Privacy & Security  l  Contact Us  l  Send Feedback